smart ash incinerator – Waste Incinerators

It is an auto reader for Bacillus Stearothermophilus to test the spore discharge after treatment (sterilization) of (G) Technical Specifications of Spore tester Features and Specifications: should be a very Accurate, reliable and easy-to-use units for reading rapid readout biological indicators (RRBI) for the waste. Automatically reads indicator results. There should be red plus (+)…

Read More

3 Chamber Incinerator – Waste Incinerators

Primary chamber:Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic)  01 x temperature sensor points with complete internal fans.Secondary Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.Third Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.Integrated dual flu gas washer: Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.Chimney:Heavy duty 5mm or more stainless steel casing mild steel casing.Stack cap/spark arrestors.Control Panel:a.Temperature Monitoring with 4 digit display.b.Thermostat control device for burner (fuel saver)c.Temperature control 0-12 hours.d.Integral fan timer control

Read More

20-30kgs of waste per human resources with water scrubber – Waste Incinerators

Merchandise Specification Variation YD-30C (client made version) Main Product List Main Burning Chamber( Text stainless-steel) Second Combustion Chamber( Main body stainless steel) Mix-Combustion Chamber Damp Scrubber( Washing Tower)( Text stainless-steel) Incinerator Control Instance Smokeshaft:5.0 Meters *( update to Stainless Steel, cost-free cost) Italy heater: 02 systems Oil Container (if petroleum fuel): 100Liters Style YD-30C Feed…

Read More

50-100-150-200 Kgs per Hour Solid Waste Incinerator Model TS150 PLC 1570Liters Chamber – Waste Incinerators

Waste Incinerator Model TS150 PLC, Overview Construction is dual/double combustion chamber with 02 sets oil burner, batch load  incineration equipment. Waste feed chamber is 1570Liters (1.57m3, TS150 PLC).  Primary & Secondary combustion chambers and smoke filter chamber.  Batch load on the bottom of chamber. Incinerator PLC panel control suit for local operation. Primary Combustion Chamber: …

Read More

Containerized Mobile Incinerator Version CA50 – Waste Incinerators

Waste Burner (Containerized Mobile Heater) Ability: Normal 50 kgs per human resources Style CA50 Interior Dimensions 100 x 80 x 70 centimeters Main Product Listing Main Burning Chamber Added Burning Chamber Smoke Filter Chamber Heater Control Situation Smokeshaft:5.0 Meters *( upgrade to Stainless-steel, cost-free rate) Italy oil/gas heater: 02 systems Oil Container (if petroleum gasoline…

Read More

Medical Waste Burner Capability Requirement 100kgs per hr – Waste Incinerators

Temperature Level Show & & & & PLC Control Instance Main Burning Chamber Incinerator Text ***Primary Combustion Chamber Italy Oil/Gas Heating Unit ***Chimney:10.0Meters *** 2nd Burning Chamber *** Smoke Filter Chamber ***Italy oil/gas burner: 02 units ***Oil Tank (if oil fuel): 200Liters *** Heater PLC Control Circumstances Items/Model TS100( PLC) Principle Waste Incineration Therapy Melt Cost…

Read More

Typical 10kgs per hour incinerator for small hospital – Waste Incinerators

This equipment quality structural for kinds of site, like hospital, environmental department,  animal cremation agencies, etc.  HICLOVER Incinerator supply updated models with dual combustion chamber,  mix-combustion chamber and smoke filter  chamber with refractory lines, and the combustion chamber temperature up to 1200 deg C. Equipment Technical Specifications Model YD-10C Picture Feed Capacity Typical 40 kgs…

Read More

Twin heat heaters in addition to Double chamber heater Burning Capacity up to 30 Kg per hr with wet scrubber – Waste Incinerators

Dual heat burners and dual chamber incinerator Burning capacity up to 30 Kg per hour Main Product List Primary Combustion Chamber(Main body stainless steel) Secondary Combustion Chamber(Main body stainless steel) Mix-Combustion Chamber Wet Scrubber( Washing Tower)(Main body stainless steel) Incinerator Control Case Chimney:5.0Meters  Stainless Steel Italy gas burner: 02 sets Oil Tank (if oil fuel):…

Read More

incinerator manufacturer in china – Waste Incinerators

of primary and secondary air?7. Is it possible to have an automatic bottom ash unloading system?9. Is it possible to have an automatic bottom ash unloading system?6. Does it provide for management interventions to correct waste feed, grate speed, and temperature, quantity and supply of primary and secondary air?5. Does this include auxiliary burners?3. Could…

Read More

Hiclover waste burner additional components – Waste Incinerators

We are china incinerator manufacturer, contractor and exporter. Manufacturer make reasonable price for incinerator customer, supply medical incinerator, hospital incinerator, animal incinerators, hog incinerators, pet cremation equipment, small incinerator, pet incinerator, animal incinerator, portable incinerator, small animal incinerator, infectious waste pyrolysis machine, laboratory incinerator. HICLOVER help customer reduce purchase budget, custom made function, quality products…

Read More

Containerized Mobile Heater Pre-assembled, containerized Kind – Waste Incinerators

Model CA100 Picture Waste Therapy Medical Waste Incineration Treatment Feed Capacity Ordinary 100-200 kgs per feed Burning Price Typical 100-120 kgs per human resources Burning Time per Feed Criterion 1-2 hr Control Placing PLC( Programmable Reasoning Controller Incinerator) Voltage 220V Power 1.0 Kw Gas Diesel oil Burner Italy Heater Feed Mode Handbook Temperature Level Monitor…

Read More

Device Measurement : Burning Rate : 60-80 kg/hr Pyrolytic Double Chamber Burner – Waste Incinerators

The requirement is for a pyrolytic double-chamber incinerator. The incinerator shall be capable of using diesel  fuel as a supplemental fuel oil. It should incorporate an Air Pollution Control (APC) System suitable for basic emission control. The proposed incinerators shall be appropriate for critical harsh environmental conditions, suitable for rapid  deployment, and different climate zones…

Read More

Plus Size Burning Rate : 150-200 kg/hr Strong Waste Devices Main as well as 2nd Combustion Chamber Burner – Waste Incinerators

The air supply should be controlled efficiently; Flame contact with all the gases should be achieved; The minimum combustion temperature of the primary chamber should not be less than 850°C; The primary combustion chamber should be equipped with a means to provide supplemental liquid fuel supply. The primary chamber should be cold face refractory lining,…

Read More