About Us – Waste Incinerators

About Us – Waste Incinerators Skip to content Nanjing Clover Medical Technology Co.,Ltd. local in Nanjing city, China which is near to Shanghai port. We are Waste Incinerator Manufacturer in China. We produce medical waste incinerators, pet animal cremation equipment and othe solid waste incinerators. The burning rate from 10kgs,20kgs,30kgs,50kgs,100kgs,150kgs,200kgs,300kgs,500kgs,600kgs per hour, the daily treatment…

Read More

hospital incinerator distributor – Waste Incinerators

CSH Wellness Facility, (Calabar, Nigeria) Mmedical waste burner capable of obtaining rid of roughly 0.5 cubic meter of pathological or infectious waste. Burner to have double burning room as well as control quantity of dioxin as well as various other gasses discharged without being damaging. Approximated measurements, to distributors common, nevertheless to be portable as…

Read More

Heater tiny to tool waste dispossal – Waste Incinerators

Carburant DieselLargeur (mm) 2150Carburant Diesel.Ouverture Porte 1000×× × × 2000.Longueur (mm) 3110.Longueur (mm) 3110 The waste most contain differ materials plastics, rubber, paper, turf, leaves, woods, fruits, packaging carton, as well as likewise whole many others Minimum température d’opération 950.Dimension externes.Hauteur (mm) 800.Hauteur (mm) 3300.Ouverture Porte 770×× × × 2000.Largeur (mm) 1800.Opération. Burner miniature to…

Read More

nanjing clover incinerator price – Waste Incinerators

Hazardous medical waste: Clinical and related waste, arising from medical, nursing or comparable practices and waste2. The unit should function wit. No fuel and use only 120V or 220V electricity for the blowers.grease, and paraffin based xpired medicines. Expired and/or polluted fod: Spoiled fresh food or unusable MRE’s (Meal Ready for Eat – dry food)…

Read More

Incinerators in Fiji – Waste Incinerators

IT is a daily occurrence to see black smoke being emitted from the chimneys in the Colonial War Memorial Hospital in Suva. And following a recent letter to the editor from Satish Nakched, The Fiji Times followed up with an investigation into the smoke which poses an obstruction for the nearby residents of Waimanu Rd…..

Read More

waste burner manufacturer china – Waste Incinerators

waste burner manufacturer china, Waste chamberTimer control 0-12 hrs.Huge complete dimension leading bunches door together with fluid retention sill.Ash elimination door.Containerization: 20 foot delivery container with incinerator fitted.Ancillaries: Operating and maintenance manuals.(30.5 centimeters), 16 range (1.52 ″″″.Control Board: Control of 1 heater. Vital fan timer control.Main Chamber: Sturdy steel covering.0.6 m refractory lined pile.1 x…

Read More

medcial incinerator manufacturer – Waste Incinerators

The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests so as to enable sending of a CEB Engineer for witnessing  of  the  factory  tests.    A’Factory  Acceptance  Test ‘  schedule  shall  be   mutually agreed between the successful Bidder and the CEB Engineer. NOTE:…

Read More

view – Waste Incinerators

HICLOVER, Nanjing Clover Medical Technology Co.,Ltd, supply system solutions for medical environmental protection, animal and pet cremation engineering, other municipal solid waste incineration project.We supply single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators for laboratory, clinic, hospital, medical center, hygiene clinical waste destruction with medical disposable, biological waste, medical…

Read More

Measures of medical waste management – Waste Incinerators

Average 20%-25% of the total waste generated by health care establishments is regarded as hazardous and might create an assortment of health and environmental risks if not handled and destroyed in an appropriate manner. With years worth of experience in this industry, our medical assortment of incinerators are designed to cater to the economical needs…

Read More

Burning capacity 50kg/hr with wet scrubber with dual fired burner – Waste Incinerators

This model is small-scale waste incineration equipment for small waste output.  Construction is dual/double combustion chamber with 02 units oil/gas burner.  Waste feed chamber is around 900Liters (0.9m3, YD-50). Primary & Secondary  combustion chambers and included mix-combustion chamber. Waste load on the  bottom of chamber. Incinerator panel control suit for local operation. Model YD-50 with…

Read More

incineration combustion chamber – Waste Incinerators

Supervision of installation of the new incinerator set shall be provided by the successful Bidder while labor and heavy duty equipment shall be provided by CEB.     ?     The successful Bidder shall submit to CEB, prior to shipment of the incinerator set, its processes for the installation of the incinerator and exhaust chimney. This…

Read More

Animal body parts,other biomedical waste,organs dung – Waste Incinerators

13.     Civil    works,    installation    andComnuss!Onmg    lndusive  of  civil  works  (brick  wall  incinerator  houseType of waste for disposal    Animal  body  parts,other  biomedical  waste,organs dung, bedding materials,plant p缸ts and meals itemsιbidding document 51. No    Features    $_pecific tions6.    11.     Opening lid    Large top open归g lid (Approx. 700 mm x 500mm) forModel of the incinerator.Of those quoted …

Read More

Post Combustion Incinerator – Waste Incinerators

Product Description Incinerator is a incineration equipment, direct fire waste by gas fuel or oi fuel. As different circumscription, incinerator can be named many words as below:  Therapy capacity: Small scale incinerator, large scale incinerator and incineration pant.  Waste material: Municipal waste incinerator, medical waste generated in ghana, medical waste in azerbaijan, medical waste in…

Read More